.
Slideshow image Slideshow image Slideshow image Slideshow image
Welcome

The Petro Hydraulic Lift (PHL) system has been proven to excel in gas well deliquification by providing the unique ability to match the pumping rate to a well's natural feed-in rate. As the PHL system adjusts to match the well's feed-in rate, the pump intake rate is also adjusted, providing for more efficient operation of the down hole rod pump. This process optimizes well production and drastically reduces tubing and rod wear, resulting in both lower operating costs and lower, or eliminated, down time between workovers.

PHL Systems offer:
  • 25 - 75 HP natural gas/propane or electric power units (see data sheets)
  • Open & enclosed/winterized power units
  • 96", 120", 144", and 312" stroke lengths for both coal bed methane gas and deeper well applications
  • Standard & advanced control systems
  • Standard well site installation supervision
  • Monthly preventive maintenance programs
The long, slow, electronically controlled strokes of the PHL unit contribute to lower maintenance costs, reduced component wear, and significant increases in well efficiency.


Features & Benefits:


The PHL system is designed to operate continuously while matching the feed-in rate of the well and eliminating the need for pump-off controllers. This allows the reservoir to "dry out," resulting in maximum production ability of the well.


Other features and benefits include:

  • Quick setup & takedown: in as little as 2 hours (conditions allowing)
  • Reduced rod wear: dramatically reduced rod compression and stretching, rod separation, and tubing wear
  • Change lift speeds: instantaneously,1/2 SPM - 4 SPM
  • Few moving parts: reduced human and animal hazard
  • Variable applications: oil, gas, de-watering, and more...
  • Greater pump efficiency & well production: by matching feed-in rate of well



Copyright © 2012. Lufkin Industries, Inc.,
All Rights Reserved.